LOD 300
Structure
Columns, beams and slabs modelled to the structural drawings.
Illustrative model · Coastal Village Office, The Red Sea
FAB Architectural Design Consultancy · Dubai
We deliver design drawings, BIM models and shop drawings for consultants, contractors and our own projects in the UAE and Saudi Arabia.
LOD 100 Concept Design · LOD 200 Schematic Design · LOD 300 Detailed Design · LOD 400 Shop Drawings · LOD 500 As-Built Models
LOD 300
Columns, beams and slabs modelled to the structural drawings.
LOD 350
HVAC and drainage modelled and checked against the structure, so clashes are solved on screen, not on site.
LOD 400
Every discipline combined into one clash-free model, the source of our LOD 400 shop drawings and quantities.
LOD 500
The finished building captured as an LOD 500 as-built model, reviewed and approved by Red Sea Global.
Concept to handover
Design drawings, BIM models, shop drawings and as-built documentation
Project portfolio
Completed and ongoing work, with more projects in the pipeline
Dubai
Business Bay base, working across the UAE and Saudi Arabia
Selected work
Photo: Jürgen Reichmann
FAB completed the full fit-out BIM scope for the Leaders Pavilion near Al Wasl Plaza, delivering LOD 500 as-built models.
Image: Expo City Dubai
FAB is working on Al Waha, a residential development that adapts Expo 2020 legacy buildings into apartments and duplex lofts.
Image: Studio Libeskind
FAB is building the interior fit-out BIM models for the Tower 1 hotel from scratch, starting at LOD 300 and developing them through LOD 400 to LOD 500 as-built handover.
Red Sea Global’s on-site operations centre at Coastal Village accommodates 500 people and includes a restaurant and auditorium.
Ummahat Islands resort setting · Red Sea Global
A complete BIM model of the resort's back-of-house buildings, delivered to Atkins' standards and explored in virtual reality.
St. Regis resort site context · Al-Majal Al-Arabi Group
BIM modelling and documentation at LOD 400 and LOD 500 for the island's MEP hub.
Shebara resort setting · Red Sea Global
BIM modelling for a resort hotel, including its main kitchen.
Services
Multi-discipline models coordinated and clash-checked before work reaches site.
Fabrication-ready drawings and models your site teams can build from.
Verified models of what was built, ready for the owner's facilities team.
Quantity take-offs and asset tracking sheets extracted straight from the model.
As-built surveys that turn existing structures into accurate BIM models.
Architecture, structure and MEP support for design and construction teams.
Process
We agree the BIM execution plan, standards and level of detail with your team.
Disciplines are modelled, clashes found and closed in regular coordination meetings.
Approved drawings, quantities and asset sheets are issued to site.
Site changes are captured into an LOD 500 model for the owner.
Contact
Send the drawings or a short brief and we'll get back to you.